- A lot of the piping, plumbing and electrical is put under the subfloor. It is still accessible from underneath but its cleanly tucked under the floor and protected. The vinyl floor is placed on top. It goes in before any of the interior walls so that the flooring does not have to be cut around the shower, toilet, kitchen or walls.
- In this picture, you can see that the deck is also done at this time as well.
- Next, the interior is put in place and the exterior walls are built and set.
- Check out my next post when I hopefully (if I can make it work) show a clip from the factory.